Connected the Altrak control rod to the elevator idler arm. I still need to trim, drill and tap the forward end of the solenoid pushrod for the forward rod end when the solenoid is finally positioned.
Ordered a 4mm od x 1.7mm id right angle connector cable for the AV8OR power when installed in the Airgizmos mount.